超博弹性的制造系统
是在美国加州库柏堤诺市设计并分发给全世界各地代理及经销

超博与其合作代理伙伴均需有丰富的建造浮台的技术与经验。 超博深入了解浮码头的浮台与锚碇系统间的配合与它们之间协调的重要性 一个良好的浮码头整体生产计划,须有优良的设计和可快速制造的工作程序来指导整个浮码头生产系统,包含将要使用的构建组配件规格型号,零件的有效快速检查方法,以及如何能顺利将大批量的组件传送到工作现场,又能不混乱的进行流畅组装。     

超博安装程序的简要概述如下:

1.  Planning the Project and determine specifications
2.  Selection of anchors model and design the concrete anchor size shape and structure
3.  Delivery and setup of the Floats, Superflex stands, and mooring lines or chain with shackles
4.  Connection of whole system components
5.  Install every SuperFlex mooring line with initial pretension stress request , if it is meet the civil engineer design
calculation, after the 5 ~ 7 days of whole Install completed, or after hurricane attack, check & re-adjust it if necessary.
Offshore Mooring
Manufacture

2004 © American Marine, SUPFLEX® Germany, Patent No. 203.17.006.7 All Rights Reserved
2005 © American Marine, SUPFLEX® U.S. Patent No. 6,899,050 B1.  All Rights Reserved
2006 © American Marine, SUPFLEX® China Patent No. ZL 2003201005264 All Rights Reserved
2007 © American Marine, SUPFLEX® China Patent No. ZL 200520047348.2 All Rights Reserved
2012 © American Marine, SUPFLEX® U.S. Patent No. 7,651,299 B2.  All Rights Reserved
沪ICP备17050477号-1
Superflex Nano Taut Elastic Mooring Strands Factory